Client: VEI Invest Holding AD

 

Dates: 2024

 

Country of assignment: Bulgaria

 

Description of actual services provided:

 

 

The Project aims at the construction of an electrolysis plant to produce green hydrogen with a capacity of up to 30 MW, a photovoltaic power station, and a compressor station.

The objective of the assignment is implementing the following Chapters of the Project Idea Phase:

  • General Plan of the Project Site
  • Technological Processes Introduction
  • Equipment Technical Characteristics and Initial Design
  • Initial Construction Plan
  • Initial Geodetic Surveys
  • Fire Safety Requirements

 

`

Client: European Bank for Reconstruction and Development (EBRD)

 

Dates: 2021 - 2022

 

Country of assignment: Bulgaria

 

Description of actual services provided:

 

Bulgarian water sector comprises a total number of 52 regional water and waste water operators (RWOs). Bulgarian RWOs face multiple financial and operational challenges including significant physical water losses, un-optimized energy consumption, poor revenue collection, lack of strategic asset management planning, poor data collection and reporting, inability to attract and maintain qualified and experienced personnel, lack of modern Enterprise Resource Planning (ERP) systems, etc.

The overall objective of the assignment is to identify Energy Efficiency (EE) and Renewable Energy Solutions (RES) opportunities at each of the following RWOs:

  • Burgas RWO
  • Dobrich RWO
  • Pernik RWO
  • Smolyan RWO
  • Sliven RWO
  • Stara Zagora RWO
  • Vratsa RWO

Specific objectives of the assignment include:

  • Screening of water companies’ operation processes and identifying areas with high energy intake;
  • Identifying proven EE measures available including energy management/digital solutions and energy generation measures (including RES) that drive better utility performance/operation;
  • Identifying and prioritizing key investments (up to EUR 10 million per company), which will have quick, but long-term effect on operators’ energy consumption.

 The Encon’s Team is responsible for implementing the following tasks:

  • Task 1: Assessment of the current operational deficiency of each water company by reviewing the relevant information and discussions with relevant staff and Water Holding.
  • Task 2: Assess current electrical consumption for each company including analysis the overall operational inefficiency benchmarked against current best practices.
  • Task 3: Assess the EE and RES potential at each of the seven regional water and waste water operators.

Client: United States Agency for International Development (USAID)

Dates: 2018 - present

Country of assignment: Kazakhstan, Tajikistan

Client: United States Agency for International Development (USAID)

Dates:.2019 - present

Country of assignment: Ukraine